Adna School District, Pirate Stadium
Superintendent for the entire project and provided various site work to include Utility Ditching, Field Drainage, Storm Water Drainage, Irrigation, Parking Lot, Grandstand Building Pad, Goal & Scoreboard Installation, Playing Surface & Track Grading.
Road Approach, Driveways, French Drains, Power & Water Ditches, Backfill, Topsoil, Finish Grading.
Driveway cut and install, parking, and building pad excavation.
Hauling road base coarse rock.
Road Approach, Culvert & Driveway
Trenching under Driveways, Installing Power and Phone Conduit
Trenching Utilities
Land clearing and grading to provide proper drainage of surface water.
Stump Removal & Building Pad
Catch Basin, French Drain, Storm Water Excavation & Installation